Friends of Stevens Creek Trail's Weblog |
21 03 2007 |
Wed, 21 Mar 2007 |
|
If you drove down El Camino Real by Hwy 85 today, you surely would have noticed
that there were only 2 lanes open in each direction, even though it doesn't
seem to be causing much of any backup or slowdown.
Here's an overview
The good news about this is that those lanes are closed for a GREAT reason - the construction of the bicycle and pedestrian tunnel under El Camino Real for the extension of the Stevens Creek Trail! Workers today were busy with 2 separate projects. One team was pulling up the paving stones from the median strip and stacking them up for later re-use. Click for a peek Another team was working at the entrance of the parking lot for Homestead Studio Suites Hotel to widen the driveway and make room for the new tunnel on the north side of the El Camino. Take a look Previously, a water hookup on the south side of El Camino Real was already moved a few feet to make room for the tunnel to come through. Later, on the south side, the entrance to Hwy 85 will also be redesigned such that P.G.&E. and SCVWD access to the meadow is preserved.
|
posted at: 20:55 | path: | permanent link to this entry |
![]() |