stop advancing Slower Faster!


The crane had to stay clear of the 50,000 volt power lines overhead. It was easily taller. They were de-energized for the day for safety.

: 085_Bridge_crane_positioning.jpg :
2/25/2009 @ 19:43:56
Change the slideshow settings: Skip by about:
Jump to a particular day and time:

Return to the index